
Hiking map › Rold Skov and Rebild Bakker
Gul
10.0 km. Along the way you climb 94 m and descend 133 m; the highest point is at 84 m. Walking time about 2:48 h, breaks not included.
When is the weather best for it? Best start time in the planner →
Elevation profile
Trail condition
Dry
Dry
Outdoors today in Rold Skov and Rebild Bakker →
Estimate for unpaved paths at the start: from recent rain and the forecast, sandy soil dries fast. From our own weather and soil data – hiker reports below take precedence.
Nobody has reported anything in the last 30 days. Been here? Report the condition in the hiking map.
Best hiking day this week at the start: Monday – dry, 6 °C
Along the way
- km 7.0 Lille Blåkilde Spring
Spots up to 300 m from the trail. Please check hut opening times beforehand.
Frequently asked questions
How long is the “Gul” trail?
About 10.0 km. The route is not fully continuous in the map data, so the real length may be a little longer.
How much elevation gain does the “Gul” trail have?
About 94 m of ascent and 133 m of descent. The lowest point is at 6 m, the highest at 84 m.
How long does the “Gul” trail take?
Plan for about 2:48 h of walking time (using the usual hiking-time rule from distance and elevation), plus breaks.
Can I follow the “Gul” trail on my phone?
Yes. Open the trail in the hiking map and tap “Follow this trail”. The Waldschatz planner takes over the trail (for long trails a stretch of about 15 km) with weather, navigation and an offline map – free with an account.
What is the “Gul” trail like today?
At the start, unpaved paths are probably dry today (from recent rain and the forecast, sandy soil dries fast). This is our estimate from weather and soil, not a measurement – current reports from hikers are listed under “Trail condition”.
More trails in Rold Skov and Rebild Bakker
Gravlev Ådal ruten · 12 kmRebild Bakker Ruten · 11 kmLindenborg Å rundtur · 11 kmLangmosen Rød rute · 8 kmMadum Sø Blå rute · 7 km
Route: © OpenStreetMap contributors. Elevation and walking time are estimates – signs and closures on site take precedence.