LLC - Stage 6
16.8 km from Napp to Nusfjord. Along the way you climb 557 m and descend 557 m; the highest point is at 174 m. Walking time about 5:42 h, breaks not included.
When is the weather best for it? Best start time in the planner →
Elevation profile
Trail condition
Frozen, possibly icy
Dry
Dry
Estimate for unpaved paths at the start: from recent rain and the forecast, sandy soil dries fast. From our own weather and soil data – hiker reports below take precedence.
Nobody has reported anything in the last 30 days. Been here? Report the condition in the hiking map.
Frequently asked questions
How long is the “LLC - Stage 6” trail?
About 16.8 km, from Napp to Nusfjord.
How much elevation gain does the “LLC - Stage 6” trail have?
About 557 m of ascent and 557 m of descent. The lowest point is at 3 m, the highest at 174 m.
How long does the “LLC - Stage 6” trail take?
Plan for about 5:42 h of walking time (using the usual hiking-time rule from distance and elevation), plus breaks.
Is the “LLC - Stage 6” trail difficult?
The hardest section is graded T4: alpine trail, experience and a head for heights needed. Plan weather and fitness accordingly.
Can I follow the “LLC - Stage 6” trail on my phone?
Yes. Open the trail in the hiking map and tap “Follow this trail”. The Waldschatz planner takes over the trail (for long trails a stretch of about 15 km) with weather, navigation and an offline map – free with an account.
What is the “LLC - Stage 6” trail like today?
At the start, unpaved paths are probably frozen, possibly icy today (from recent rain and the forecast, sandy soil dries fast). This is our estimate from weather and soil, not a measurement – current reports from hikers are listed under “Trail condition”.
More trails in Lofoten
LVH11 · 22 kmLLC - Stage 4 · 19 kmLLC - Stage 7 · 18 kmLLC - Stage 3 · 16 kmLLC - Stage 8 · 16 kmLVH12 · 13 kmLLC - Stage 2 · 13 kmLLC - Stage 5 · 11 kmLVH13 · 11 kmLVH6 · 9 kmLVH5 · 8 km
Route: © OpenStreetMap contributors. Elevation and walking time are estimates – signs and closures on site take precedence.